NTC / ATC

In its role as control area manager, Austrian Power Grid AG is responsible for the determination of available line capacities for the market and their allocation, while simultaneously taking into consideration secure grid operation in Austria. On the basis of past records and many years of experience with procedures, which have been developed by ENTSO-E (European Network of Transmission System Operators for Electricity), these capacities are calculated and agreed with the neighbouring grid operator.

 

The NTC and ATC values presented on this page are constantly updated to give market participants a timely status of the free capacities available.