Grid Projects
Expansion of the transmission grid and construction projects in the APG control area can have an impact on cross-border capacities.
The current reporting of grid projects with an influence on the NTC > 100 MW takes place in compliance with Regulation (EU) No 543/2013, Article 9.1.
Projects that are already in operation and have been disclosed under Regulation (EU) No 714/2009 are made public in the download box on this page (German only).